gridverse-open-low-code-pla.../MVP_PLAN.md

1.9 KiB
Raw Permalink Blame History

GridVerse MVP Plan (812 weeks)

Phase 0 — Protocol skeleton and adapters (02 weeks)

  • Define core primitives: Objects, Morphisms, PlanDelta, and contract schemas (0.2).
  • Publish contract schemas and two starter adapters (e.g., DER controller and Building load controller).
  • Build a minimal ADMM-like solver scaffold and delta-sync engine; TLS-ready transport between components.

Phase 1 — Governance and conformance (24 weeks)

  • Introduce a governance ledger scaffold and lightweight identity model.
  • Implement a conformance harness to validate adapters against contract schemas.
  • Implement secure delta-sync with bounded staleness for offline/partitioned operation.

Phase 2 — Marketplace and codegen (46 weeks)

  • Add adapter marketplace entry points and a minimal codegen path.
  • Provide a reference UI sketch for graph-based device/constraint composition.
  • Extend registry with versioning and per-message metadata for replay protection.

Phase 3 — Cross-domain pilot and HIL (612 weeks)

  • Introduce a simulated second domain and demonstrate cross-domain planning.
  • Conduct hardware-in-the-loop validation with 23 devices; measure plan quality, convergence, and latency.

Architecture notes (recap)

  • EnergiBridge: Lightweight bridge mapping GridVerse primitives to a vendor-agnostic IR.
  • GraphContractRegistry: Versioned contracts and per-message metadata for auditing.
  • Adapter Marketplace: Starter adapters and marketplace scaffolding.
  • Simulation & HIL: Digital twin support and hardware-in-the-loop testbeds for cross-domain evaluation.

Ownership model (provisional)

  • Core protocol and EnergiBridge wiring: you
  • Registry conformance and adapter conformance tests: me
  • Starter adapters and marketplace scaffolding: you
  • Governance and audit artifacts: joint effort

Note: This plan is a living document and should be updated as milestones are reached and new learnings emerge.