1.9 KiB
1.9 KiB
GridVerse MVP Plan (8–12 weeks)
Phase 0 — Protocol skeleton and adapters (0–2 weeks)
- Define core primitives: Objects, Morphisms, PlanDelta, and contract schemas (0.2).
- Publish contract schemas and two starter adapters (e.g., DER controller and Building load controller).
- Build a minimal ADMM-like solver scaffold and delta-sync engine; TLS-ready transport between components.
Phase 1 — Governance and conformance (2–4 weeks)
- Introduce a governance ledger scaffold and lightweight identity model.
- Implement a conformance harness to validate adapters against contract schemas.
- Implement secure delta-sync with bounded staleness for offline/partitioned operation.
Phase 2 — Marketplace and codegen (4–6 weeks)
- Add adapter marketplace entry points and a minimal codegen path.
- Provide a reference UI sketch for graph-based device/constraint composition.
- Extend registry with versioning and per-message metadata for replay protection.
Phase 3 — Cross-domain pilot and HIL (6–12 weeks)
- Introduce a simulated second domain and demonstrate cross-domain planning.
- Conduct hardware-in-the-loop validation with 2–3 devices; measure plan quality, convergence, and latency.
Architecture notes (recap)
- EnergiBridge: Lightweight bridge mapping GridVerse primitives to a vendor-agnostic IR.
- GraphContractRegistry: Versioned contracts and per-message metadata for auditing.
- Adapter Marketplace: Starter adapters and marketplace scaffolding.
- Simulation & HIL: Digital twin support and hardware-in-the-loop testbeds for cross-domain evaluation.
Ownership model (provisional)
- Core protocol and EnergiBridge wiring: you
- Registry conformance and adapter conformance tests: me
- Starter adapters and marketplace scaffolding: you
- Governance and audit artifacts: joint effort
Note: This plan is a living document and should be updated as milestones are reached and new learnings emerge.