GridVerse Open Low-Code Platform
- Overview
- GridVerse is an open-source, cross-domain energy optimization platform. It provides:
- A Graph-Contract Registry for versioned data contracts
- An Adapter Marketplace for plug-and-play cross-domain adapters
- A tiny ADMM-like solver and delta-sync protocol for distributed optimization
- A canonical EnergiBridge to translate between GridVerse primitives and a vendor-agnostic IR
- Water-Pump adapter and cross-domain adapters (WaterPumpAdapter) to bootstrap multi-domain integration
Architecture (highlights)
- gridverse.contracts: LocalProblem, SharedVariables, PlanDelta, ConstraintSet, DeviceInfo
- gridverse.registry: GraphContractRegistry
- gridverse.adapter_marketplace: starter adapters and skeleton interface
- gridverse.solver / gridverse.delta_sync: lightweight solver and offline sync
- EnergiBridge: canonical bridge for cross-domain interoperability
How to run
- `bash test.sh` to run tests and packaging checks
- Python packaging is defined in pyproject.toml
This repository includes starter adapters to bootstrap interoperability:
- DERInverterAdapter and BuildingLoadAdapter under gridverse/adapter_marketplace
Ready to publish signal
- Once all MVP components are validated and tests pass, a READY_TO_PUBLISH file will be created at the repo root to signal readiness for publishing.
MVP Roadmap (high level)
- Phase 0 (0-2 weeks): define core protocol (Objects, Morphisms, Functors), publish contracts v0.2, implement two starter adapters, build a minimal ADMM-like solver and delta-sync engine.
- Phase 1 (2-4 weeks): add a small set of global constraints (mesh energy balance, water budgets), governance ledger, offline simulations with digital twins.
- Phase 2 (4-6 weeks): adapter marketplace entry points, minimal codegen path, reference UI for graph composition of devices and constraints.
- Phase 3 (6-8 weeks): hardware-in-the-loop validation with 2-3 devices, measure plan quality, convergence, latency; prepare for field pilots.
Contribution & Governance
- This project follows a collaborative, repository-driven development model. See AGENTS.md for architectural guidelines and contribution rules.
- Tests and packaging validation are required before considering publishing artifacts.
- If you add adapters, ensure they adhere to the Interface contracts and include minimal unit tests.
### EnergiBridge Interoperability (Optional Reference)
- EnergiBridge provides a canonical, lightweight bridge between GridVerse primitives and a vendor-agnostic intermediate representation (IR).
- It enables plug-and-play adapters and a Graph-of-Contracts registry to interoperate with external backbones (e.g., Open-EnergyMesh, CatOpt).
- Core mappings (illustrative):
- Objects -> LocalProblems (per-site optimization tasks)
- Morphisms -> SharedVariables / DualVariables (signals and priors)
- PlanDelta -> incremental decisions with metadata (timestamp, contract_id, signature)
- Limits/Colimits -> global constraints layer and policy hooks
- AuditLog / PrivacyBudget -> governance and audit trails per message
- MVP hook: EnergiBridge provides to_ir / from_ir translations and a minimal bootstrap_contracts helper to seed a registry with basic schemas.
- Starter adapters (DER, Building Load, etc.) wired through the Adapter Marketplace can consume/emit the canonical IR for cross-domain optimization.
- Next steps (phased):
1) Integrate EnergiBridge mappings into the GraphContractRegistry conformance flows.
2) Add lightweight tests for to_ir / from_ir translations.
3) Expand the registry to support per-message metadata for auditability and replay protection.